The work of this project includes: implementation of verification operations after the improvement of the Taoyuan market site, groundwater monitoring of the early warning network in the industrial zone, inspection and maintenance of monitoring wells, inspection of the management site, regular site monitoring, site inspection and supervision, and emergency response to public complaints Work, laws and regulations publicity meeting and related administrative assistance. (1) According to the supplementary provisions of the public selection and bidding instructions, the winning bidder should submit the "Quality Assurance Plan of the Entrusted Plan" to the Environmental Protection Agency of the Executive Yuan for review within 10 days after the bid is awarded, which has been verified on February 4. . (2) Investigation and verification. Factory pollution site verification, 8 factory pollution sites, and 16 farmland site verification have been carried out (3) Groundwater monitoring of industrial zone early warning system, 3 times (6 times in total) have been completed in high and dry seasons ) groundwater sampling monitoring. (4) Regular monitoring of the site:Two site has been implemented in the restricted use area of groundwater; (2) The inspection of monitoring wells completed 352 times in the first half of the year and 366 times in the second half of the year. In view of the abnormal inspection operations completed in 2011 (signposts, stagnant water, covered by asphalt and other situations, they have been The appearance maintenance of 28 monitoring wells, the repair of facilities of 14 monitoring wells, the in-well photography of 56 wells, the micro-water test of 56 wells, the re-completion of 29 wells, the removal of 5 foreign objects and 5 abandoned wells were completed on site. (6) Execute 20 The public report emergency response work and investigation work. (7) Announcement of 89 declarations and inspections, 114 inspections have been completed, and the principles of non-declaration and doubtful site selection have been submitted. After screening, submit to the Soil Pollution Law Section Articles 8 and 9 Declaration of Inventory Investigation and Verification Operation_Preliminary Screening Result and Data Check and Supplement.(8) Simultaneous sampling of farmland has now completed 80 samplings; preventive action has been completed on October 7, and has applied for supervision and verification operations. (10) This year, 11 soil and groundwater publicity business briefings have been completed.
Keyword
Soil & Groundwater, Pollution Investigation, Pollution Verification
Open
top